Engineering, design, manufacture and installation of bulkheads for the construction of a new hydraulic power plant (Gas Natural Fenosa).
Saturation diving techniques and ROV services were utilised to blank two bottom drainage pipelines on an existing concrete dam at a water depth of 90m. (2012)